How to change order of blog posts on Blog front page

I did an installation of Concrete CMS some time ago (v 9.4.7) and there I could change the order of how the posts are shown on BLOG page. As it can be in the Resources.

Could choose so the latest entry always show at top. Or do I remember wrong? I can’t find where to do it, and to change the order manually in the admin seems to be a hit and miss.

I have checked al over the Full Sitemap, but can’t find any info. Not in the documentation either, and not on a web search.

Is that not possible with Concrete?

[Edit] Found a clip on Youtube that fixed it. Strange that it is not mentioned in the documentation or the Dashboard, since the guy that made the video seems to work for Concrete.

Anyway-the clip was posted in this forum aswell.

1 Like